Project Info:
Owner:
Enel Green Power

Technology:
Stainless Steel & Corten Weathering Steel

Engineer:
Turner Group

Project Value:
$250,000

Project Highlights:
Extensive repairs for this hydro dam required over 1,500 lineal feet of weld


Download Project PDF

Lawrence, MA - Stop Log Repair & Reinforcement

Summit Metal Fabricators was contracted by Enel Green Power to conduct an extensive refurbishment and reinforcement of its Lawrence, Massachusetts Hydro Dam Trash Racks and Stop Logs. The 3 curved stop logs, each weighing over 10,000 pounds, were removed, hoisted, and trucked directly to the Summit Metal Fabricators facility for restoration and fabrication.